Redland Corporate Center, Reston VA

DCS Design, Tysons Corner VA

With Ernest Ulibarri, AIA, LEED AP - Project Director

Sept 2015 - Sept 2016

 

Existing Office Complex intervention: Landscaping the existing center parking lot into a pedestrian plaza dotted of a pavilion. Renovation of a lobby and a Gym. Planning of a future wing.

I handled the pavilion from design and schematics to permit set, under the project director's supervision. I produced public consultation boards for the pavilion, as well as the future wing.

Work done in Revit.

SketchUp Rendering By JP Gonzales based on my Revit Model

 

Surface Area Study - Created in Revit using the Freeze App

 

Public consultation boards, created in Revit

 

Public consultation board, created in Photoshop